Dust And Smoke
您当前位置:Home >> Products >> Dust And Smoke

Smoke tube starting

Details

Pipeline system:
Using tapered design, keep each outlet air flow pressure equalization pipe with 1.5mm steel plate welded round, all elbows using GB elbow, branch pipe
Making the main channel with links, manual valve

Main channel length of about 20 meters
Pipeline grounding device
Electrical Instrument Control
(1) Type: electric control box (custom paint steel production) a set.
(2) Main Power: 380V * 50HZ
(3) Control power supply: 220V * 50HZ
(4) Controller: dust dedicated HCT overall timing controller
(5) Taiwan IC board control jet time
(6) voltmeter, ammeter
(7) disk (Local) Control
(8) inside the appliance
A. switch. (Mitsubishi)
B. electromagnetic contactor and thermal overload relay (Mitsubishi)
2013/11/20
C.11KW Mitsubishi inverter